Food and Drug Administration—White Oak Campus

  • ESPC financing of various energy conservation measures including a central utility plant with two 7.5 megawatt (MW) dual-fuel turbine generators, a 4.5 MW natural gas turbine generator, two 2.25 MW diesel standby generators and a 5 MW steam turbine generator.
  • $160,000,000 financing.
  • Structured as a securitization.
  • One of the largest financings ever done in the ESPC sector.
  • The project is expected to save almost 48 million kilowatt-hours of electricity per year and reduce carbon dioxide emissions by 24,000 metric tons annually.

 